Interlocking Company
Call
Interlock Patios

Interlocking Patios in Toronto & the GTA

Backyard patios engineered on a compacted granular base so they never sink or heave.

A well-built interlock patio is the most-used room in your house from May to October. We excavate to the right depth, build a compacted granular base, and lay pavers on a screeded bedding layer so the surface stays flat through Ontario freeze-thaw cycles.

What makes a patio last in Ontario

Most failed patios in the GTA fail from underneath. The pavers are fine; the base was too thin or never compacted. Our standard patio base is 6 to 8 inches of 3/4-inch crushed limestone (Granular A), compacted in lifts with a plate compactor, topped with a 1-inch screeded layer of coarse bedding sand or high-performance bedding (HPB).

Edges are locked with a concrete or PVC edge restraint so the field can't spread, and joints are filled with polymeric sand that hardens against weeds and ants.

Patio styles we build

Random-pattern flagstone-look pavers for a natural feel, large-format slabs (24x24, 24x36) for a clean modern look, or classic 3-piece Unilock and Permacon patterns. We add borders, inlays, seating walls, fire-pit pads and step-downs when the yard calls for it.

Popular manufacturers we install: Unilock, Permacon, Techo-Bloc, Best Way Stone and Oaks.

Large-format slab pool patio with an armour-stone waterfall wall in Richmond Hill
Ground-level view of a large-format slab patio with a planted island
Cobblestone paver patio beside fresh sod at the house wall

What’s included

  • ✓Layout and grading plan with proper slope away from the house
  • ✓Excavation and haul-away of soil
  • ✓Compacted Granular A base (6 to 8 inches)
  • ✓Screeded bedding layer, pavers, edge restraint
  • ✓Polymeric sand joints and final compaction
  • ✓Site cleanup

Pricing

Patios typically run $25 to $35 per sq ft installed depending on paver choice, access and yard grade. A 300 sq ft patio usually lands between $7,500 and $10,500. See the pricing page for what moves the number.

Loading the 3D build…
Watch it get built

Scroll to build a patio, layer by layer.

STAGE 01

Excavate to depth

The old lawn and soil come out, 8 inches down for a patio and up to 12 for a driveway, past the topsoil and any builder fill.

Interlock Patios FAQ

How long does a patio take to build?

Most residential patios (200 to 400 sq ft) take 2 to 4 working days from excavation to final compaction.

Can you build a patio over an old concrete pad?

Sometimes. If the slab is sound and drains properly we can overlay it with thin pavers or slabs. If it is cracked or heaved we recommend removing it so the new base is built correctly.

Do I need a permit for a patio in Toronto?

Ground-level patios usually do not need a permit. Raised patios, retaining walls over 1 m, and anything near a lot line may. We will tell you at the estimate.

Where we build interlock patios
Free Quote☎